State of Florida Department of Transportation logo
Florida Department of

TRANSPORTATION

I-10 at Avalon Boulevard IOAR

Download the Final Study (PDF, 8.6MB)

Executive Summary

Download the Executive Summary (PDF, 205.8KB)

Please see the attached document.

Purpose and Need

Download the Purpose and Need (PDF, 185.2KB)

Please see the attached document.

Recommended Alternative

Download the Recommended Alternative (PDF, 4.7MB)

Please see the attached document.

Travel Time Savings

Network-wide Comparison Design Year 2045 No-Build Alternative Design Year 2045 Build Alternative Difference
Total Delay (hrs) AM Peak 1,616 264 -84%
PM Peak 1,883 286 -85%
Total Travel Time (hrs) AM Peak 1,668 317 -81%
PM Peak 1,940 344 -82%
Average Speed (mph) AM Peak 1 6 500%
PM Peak 1 6 500%

Safety Benefits