State of Florida Department of Transportation logo
Florida Department of

TRANSPORTATION

I-10 at Ward Basin IOAR

Download the Final Study (PDF, 11.9MB)

Executive Summary

Download the Executive Summary (PDF, 248KB)

Please see the attached document.

Purpose and Need

Download the Purpose and Need (PDF, 183KB)

Please see the attached document.

Recommended Alternative

Download the Recommended Alternative (PDF, 1.5MB)

Please see the attached document.

Travel Time Savings

Network-wide Comparison Design Year 2045 No-Build Alternative Design Year 2045 Build Alternative Difference
Total Delay (hrs) AM Peak 4 7 75%
PM Peak 14 16 14%
Total Travel Time (hrs) AM Peak 24 27 13%
PM Peak 36 39 8%
Average Speed (mph) AM Peak 33 29 -12%
PM Peak 22 21 -5%

Safety Benefits

Please download the study for more details.