State of Florida Department of Transportation logo
Florida Department of

TRANSPORTATION

I-10 at SR 87 IOAR

Download the Final Study (PDF, 6.8MB)

Executive Summary

Download the Executive Summary (PDF, 261.5KB)

Please see the attached document.

Purpose and Need

Download the Purpose and Need (PDF, 238.2KB)

Please see the attached document.

Recommended Alternative

Download the Recommended Alternative (PDF, 71.2MB)

Please see the attached document.

Travel Time Savings

Network-wide Comparison Design Year 2045 No-Build Alternative Design Year 2045 Build Alternative Difference
Total Delay (hrs) AM Peak 3,224 23 -99%
PM Peak 3,030 25 -99%
Total Travel Time (hrs) AM Peak 3,246 45 -99%
PM Peak 3,052 48 -98%
Average Speed (mph) AM Peak 1 21 2000%
PM Peak 1 20 1900%

Safety Benefits

Download the Safety Benefits (PDF, 241.4KB)

Please see the attached document.