State of Florida Department of Transportation logo
Florida Department of

TRANSPORTATION

I-95 at Wickham Road IOAR

Download the Final Study (PDF, 23.4MB)

Executive Summary

Download the Executive Summary (PDF, 2.9MB)

Please see the attached document.

Purpose and Need

Download the Purpose and Need (PDF, 137.1KB)

Please see the attached document.

Recommended Alternative

Download the Recommended Alternative (PDF, 2.8MB)

Please see the attached document.

Travel Time Savings

Network-wide Comparison Design Year 2033 No-Build Alternative Design Year 2033 Build Alternative Difference
Total Delay (hrs) AM Peak 439 297 -32%
PM Peak 440 389 -12%
Total Travel Time (hrs) AM Peak 539 404 -25%
PM Peak 556 499 -10%
Average Speed (mph) AM Peak 7 10 43%
PM Peak 8 8 %

Safety Benefits

Download the Safety Benefits (PDF, 179.7KB)

Please see the attached document.