I-75 at 49th Street IJR Re-evaluation

Download the Final Study (, 0 B)

Executive Summary

Download the Executive Summary (PDF, 1.5MB)

Please see the attached document.

Purpose and Need

Download the Purpose and Need (PDF, 1.1MB)

Please see the attached document.

Recommended Alternative

Download the Recommended Alternative (PDF, 3MB)

Please see the attached document.

Travel Time Savings

Download the Travel Time Savings (PDF, 250.2KB)

Please see the attached document.
Network-wide Comparison Design Year 2045 No-Build Alternative Design Year 2045 DDI Build Alternative Difference
Total Delay (hrs) AM Peak 1,557 1,139 -27%
PM Peak 1,936 1,682 -13%
Vehicle Miles Traveled (Miles) AM Peak 241,395 256,859 6%
PM Peak 250,253 266,640 7%
Average Speed (mph) AM Peak 46 49 7%
PM Peak 43 45 5%

Safety Benefits

Download the Safety Benefits (PDF, 1.7MB)