State of Florida Department of Transportation logo
Florida Department of

TRANSPORTATION

I-75 at CR 484 IOAR

Download the Final Study (PDF, 17.6MB)

Executive Summary

Download the Executive Summary (PDF, 193.5KB)

Please see the attached document.

Purpose and Need

Download the Purpose and Need (PDF, 166.5KB)

Please see the attached document.

Recommended Alternative

Download the Recommended Alternative (PDF, 551.1KB)

Please see the attached document.

Travel Time Savings

Download the Travel Time Savings (PDF, 201.3KB)

Network-wide Comparison Design Year 2034 No-Build Alternative Design Year 2034 DDI Build Alternative Difference
Total Delay (hrs) AM Peak 901 807 -10%
PM Peak 919 451 -51%
Vehicle Arrived (vehs) AM Peak 13,111 13,585 4%
PM Peak 12,217 14,390 18%
Average Speed (mph) AM Peak 31 33 6%
PM Peak 31 44 42%

Safety Benefits

Download the Safety Benefits (PDF, 221.6KB)

Please see the attached document.