State of Florida Department of Transportation logo
Florida Department of

TRANSPORTATION

I-295 East Express Phase 1 from SR 9B to SR 202 (J.T. Butler Boulevard)

Download the Final Study (PDF, 66.9MB)

Executive Summary

Download the Executive Summary (PDF, 498.7KB)

Please see the attached study for more details.

Purpose and Need

Download the Purpose and Need (PDF, 220.4KB)

Please see the attached study for more details.

Recommended Alternative

Download the Recommended Alternative (PDF, 520.6KB)

Please see the attached recommended alternative

Travel Time Savings

Network-wide Comparison Design Year 2040 Original Build Alternative Design Year 2040 Modified Build Alternative Difference
Total Delay (hrs) AM Peak 6,030 5,968 -1%
PM Peak 10,007 9,715 -3%
Total Travel Time (hrs) AM Peak 23,580 23,514 %
PM Peak 27,435 27,147 -1%
Average Speed (mph) AM Peak 44 44 0%
PM Peak 38 38 0%


Safety Benefits

Download the Safety Benefits (PDF, 300.6KB)

Please see the attached safety report for more information.