Download the Executive Summary (PDF, 532.8KB)
Please see the attached study for more details.
Download the Purpose and Need (PDF, 2MB)
Please see the attached study for more details.
Download the Recommended Alternative (PDF, 4.6MB)
Please see the attached recommended alternativeNetwork-wide Comparison | Design Year 2045 Parclo 1 Alternative | Design Year 2045 Parclo 2 - Recommended Alternative | Difference | |
---|---|---|---|---|
Total Delay (hrs) | AM Peak | 899 | 894 | -0.6% |
PM Peak | 815 | 813 | -0.2% | |
Total Travel Time (hrs) | AM Peak | 1,254 | 1,249 | -0.4% |
PM Peak | 1,164 | 1,161 | -0.3% | |
Average Speed (mph) | AM Peak | 13 | 13 | 0% |
PM Peak | 13 | 13 | 0% |
Download the Safety Benefits (PDF, 1022.9KB)
Please see the attached safety report for more information.